AWARDS AND RECOGNITIONSL. NO. 1Project Value : Rs.248.07 CrStart Date : 15.04.2006Completion Date : 31.03.2015"Construction of Dam consisting of left non-overflow section, spillway section, power dam, right non over flow section including trash rack structure, intake pool, intake structure, road bridge, encasement of penstock ferrules with RCC power house, sluices etc., at 21.065KM downstream of Nagarjuna Sagar Dam, across river Krishna near Satrasala (V) of Guntur District and Damaracherla (V) of Nalgonda District A.P"Certificate LinkSL. NO. 2Project Value : Rs.359.70 CrStart Date : 20.10.2008Completion Date : 31.05.2019"Survey, Planning, investigation, design, estimation and construction and maintenance of 6.90 k.m. (approximate) tunnel connecting lift canal from Bhadra Reservoir to Chitradurga gravity canal near Ajjampur, including tunnel Approach and exit – Package-III".Certificate LinkSL. NO. 3Project Value : Rs.156.77 CrStart Date : 19.09.2013Completion Date : 28.02.2018"Construction of Teaching hospital and residential hostels for JNU Institute for Medical Science and Research Center, Jaipur"Certificate LinkSL. NO. 4Project Value : Rs.145.64 CrStart Date : 01.03.2014Completion Date : 03.07.2014"Remodelling of Jewargi Branch Canal from Km 20.00 to 40.00 – Package J2"Certificate LinkSL. NO. 5Project Value : Rs.68.69 CrStart Date : 14.10.2016Completion Date : 31.08.2019"Construction of Tunnel in Chitradurga branch canal from Ch: 58000 mt to 61230 mtr including Approach and Exit canal"Certificate LinkSL. NO. 6Project Value : Rs.303.83 CrStart Date : 12.04.2017Completion Date : 30.11.2021"Survey, Investigation, Design,Drawing and Construction Of Tidagundi Branch Canal From Km2.70 To 17.43 Km Under MLI's of UKP Stage –III works on turnkey basis"Certificate LinkSL. NO. 7Project Value : Rs.424.63 CrStart Date : 21.02.2018Completion Date : 19.09.2023"Construction of Chitradurga Branch Canal including Earthwork excavation, Embankment, CC lining using Mechanical paver, Cross Drainage works / Road bridges / Cart Track Crossings / Tunnel / Aqueduct from km 73.000 to 90.000 km. UBP – Pkg – IX"Certificate LinkSL. NO. 8Project Value : Rs.383.26 CrStart Date : 15.07.2019Completion Date : 30.09.2020"Construction of Combined Canal from 0.00 Km to 1.80 Km & West canal from 1.80 Km to 28.99 Km including construction of Trough Aqueducts from Km 3.94 to 9.32, 12.66 to 13.16, 15.80 to 21.00 and 23.11 to 23.41 under DC-2 of TBLIS. – Elevated Prestressed & Precast U-Girder for Aqueduct"Certificate LinkSL. NO. 9Project Value : Rs.660.95Start Date : 11.12.2019Completion Date : 24.09.2022"Survey, Investigation, design, Supply, Installation, Testing and Commissioning of Lift Irrigation System (Head Works consisting of Intake canal, Jack well cum pump house, Power supply including substations and Transmission lines, Rising Main and Delivery chamber etc) and Construction of Gravity Distribution System including structure for providing lifting of water from Tungabhadra River near Halasabalu village to fill 33 tanks (Total 39 tanks) in Baramasagar hobli of Chitradurga taluk of Chitradurga District including Operation and Maintenance for a period of 5 years after successful commissioning on Turn-Key Basis for BARAMSAGARA LIFT SCHEME"Certificate Link